Installation, Permitting & Compliance Disclaimer
The SolarFlow digester system is sold as a pre-built, all-in-one
product. Solar Flow provides the equipment as manufactured; we do not
provide installation, permitting, or regulatory compliance services as
part of this sale unless explicitly stated in a separate written
agreement.
By purchasing this system, the customer acknowledges and agrees that:
-
The customer is solely responsible for determining what permits,
approvals, or inspections may be required by federal, state, county,
or municipal authorities prior to installing or operating the system.
-
Permitting and regulatory requirements vary significantly by location,
property type, feedstock, and intended use, and may include (without
limitation) building, electrical, plumbing, air quality, solid waste
handling, or health department approvals.
-
The customer is responsible for engaging any licensed professionals
(electricians, contractors, engineers, etc.) required to install,
connect, or operate the system in compliance with applicable law.
-
Solar Flow makes no representation or warranty that the system is
exempt from any specific permit, approval, or inspection requirement
in the customer's jurisdiction, and any general information provided
about applicable exemptions or regulations is for informational
purposes only and does not constitute legal advice.
-
It is the customer's sole responsibility to confirm current
requirements with their local building department, health department,
and/or air quality authority before installation and operation.
Solar Flow is not liable for any fines, penalties, delays, or damages
resulting from the customer's failure to obtain required permits,
approvals, or inspections.